HY Pacific Link · Cargo / Mission
SIM-V008 · Ro-Ro Cargo · 26 installed systems
Simulation data · Read-only monitoring
VESSEL SYSTEM
Cargo / Mission
2 installed equipment · 0 running
Healthy0 active alertsLast telemetry 0.7s ago
INSTALLED ASSETS
2 equipmentEquipment status
| Equipment | State | Primary measurement | Secondary |
|---|---|---|---|
| Ro-Ro Doorsmission-roro_doors | Standby | State Active | Load 51.5 % |
| Vehicle Rampmission-ramp | Standby | State Active | Load 49.8 % |
ENGINEERING MEASUREMENTS
16 pointsMeasurements
| Measurement | Equipment | Value | Data Quality | Updated |
|---|---|---|---|---|
| Statespecial.roro_doors.state | Roro Doors | Active | Good | 0.7s ago |
| Loadspecial.roro_doors.load_pct | Roro Doors | 51.5 % | Good | 0.7s ago |
| Primary Valuespecial.roro_doors.primary_value | Roro Doors | 5,356.8 engineering | Good | 0.7s ago |
| Secondary Valuespecial.roro_doors.secondary_value | Roro Doors | 4,620.9 engineering | Good | 0.7s ago |
| Alarmspecial.roro_doors.alarm_count | Roro Doors | 49 | Good | 0.7s ago |
| Availabilityspecial.roro_doors.availability_pct | Roro Doors | 56.9 % | Good | 0.7s ago |
| Bow Door Closedspecial.roro_doors.bow_door_closed | Roro Doors | Active | Good | 0.7s ago |
| Stern Door Closedspecial.roro_doors.stern_door_closed | Roro Doors | Active | Good | 0.7s ago |
| Statespecial.ramp.state | Ramp | Active | Good | 0.7s ago |
| Loadspecial.ramp.load_pct | Ramp | 49.8 % | Good | 0.7s ago |
| Primary Valuespecial.ramp.primary_value | Ramp | 4,881.5 engineering | Good | 0.7s ago |
| Secondary Valuespecial.ramp.secondary_value | Ramp | 4,919.9 engineering | Good | 0.7s ago |
| Alarmspecial.ramp.alarm_count | Ramp | 56 | Good | 0.7s ago |
| Availabilityspecial.ramp.availability_pct | Ramp | 54.0 % | Good | 0.7s ago |
| Closedspecial.ramp.closed | Ramp | Active | Good | 0.7s ago |
| Hydraulic pressurespecial.ramp.hydraulic_pressure_bar | Ramp | 112.5 bar | Good | 0.7s ago |